PAC INTELLIGENCE

Takeoff Studio — User Guide

from fundamentals to finished quantities

CONTENTS

  1. Getting started (Home screen)
  2. Your account — free trial, password & offline use
  3. The workspace
  4. Setting the scale
  5. Zoom & pan
  6. Starting a takeoff
  7. Assemblies — your own library
  8. Assemblies — one measurement, several materials
  9. Count takeoffs & symbols
  10. Linear takeoffs, line weight & arcs
  11. Area takeoffs, perimeter & cut-outs
  12. Zones — tag an area, and bill only what it covers
  13. The takeoff ledger (find & sort)
  14. Adding to an existing takeoff — and deleting part of one
  15. Reshaping a takeoff you've already drawn
  16. Editing colors, line style, patterns & symbols
  17. Drawing notes, labels & arrows
  18. On-drawing legend (for prints)
  19. Adding & removing drawings
  20. Rotating & naming sheets
  21. Dimension ruler, auto-straighten & undo
  22. Keyboard shortcuts
  23. Saving & backups
  24. Pricing in the app
  25. Export, print & Excel
  26. Executive Summary — the client deliverable
  27. Material conversion & waste
  28. Drawing revisions & the revision report
  29. Imperial / metric units

Takeoff Studio is a single-window quantity-takeoff workspace: open a drawing, set its scale, and measure Count, Linear and Area quantities that log automatically to a running ledger and export to Excel. Everything below matches the buttons you see on screen.

1 · Getting started (Home screen)

When Takeoff Studio opens you sign in (see Your account), then land on the blueprint Home screen. From here you can:

Home screen
The Home screen — start new, open, or pick a recent project. Your account and the User Guide are at the lower-left.

1b · Your account — free trial, password & offline use

Takeoff Studio is licensed to an account, not to a computer, so you can move to a new machine without asking anyone for a new key. Everything on this page happens in the sign-in box or on the Home screen — it is a few minutes of setup, once.

Creating an account

On the sign-in box, click the Create Account tab and fill in your email, a password, your full name and your company. The password must be at least 10 characters. There is no rule about capitals or symbols — length is what makes a password hard to guess — but a password that has appeared in a known data breach is refused, so use one you don't use anywhere else. Click Continue and you are signed in immediately.

We also email you a confirmation link. Click it to confirm your address — this is how we know password-reset codes will reach you. You can work straight away without it; until you confirm, Takeoff Studio reminds you when you sign in.

Signing in on the Log In tab works the same way. The 👁 Show button beside the password field reveals what you typed, which is worth using before you blame the password. Takeoff Studio then stays signed in on that computer; if you go a long stretch without opening it the saved session eventually expires and the sign-in box simply comes back.

Sign-in dialog
Log In or Create Account, with the show-password toggle and the “Forgot password?” link.

The 7-day free trial

A new account lands on the Activate screen. Click Start my 7-day free trial and the whole product unlocks — every feature, no credit card. Nothing is limited or watermarked during the trial, and the takeoffs you save are ordinary .tog files on your own disk.

Buying

Takeoff Studio is a one-time purchase — $499, no subscription. Click Buy Now — $499 on the Activate screen and checkout opens in your browser. When you have paid, come back to Takeoff Studio and click I've purchased — Continue; the license unlocks on your account instantly. If it says the payment was not found, wait a few seconds after paying and click it again.

If you are already an owner on a different email, use the Sign in as a different user link at the bottom of the Activate screen instead of buying twice.

Activate screen
The Activate screen — start the free trial, or buy outright.

Changing your password

While you are signed in, click Change Password at the lower-left of the Home screen. Enter your current password, then the new one twice — each field has its own 👁 Show button. The new password must be at least 10 characters, not a known-breached password, and different from the old one. You stay signed in on this computer — the new password is what you will use the next time you sign in.

Change Password dialog
Change Password lives on the Home screen, lower-left.

Forgot your password

If you cannot sign in, click Forgot password? on the Log In tab:

  1. Type your email address and click Send Code.
  2. Check your inbox for a 6-digit reset code.
  3. Type the code, choose a new password (10 characters or more), enter it twice, and click Reset Password. The code works for one hour and allows 5 tries; after that, click Send Code for a fresh one.
  4. Sign in with the new password.
No code arrived? Check your junk or spam folder, and make sure you used the same email you registered with. For anything the reset flow cannot fix, email support@proanalysiscorp.com.

Logging out

Click Log Out at the lower-left of the Home screen and confirm. Takeoff Studio returns to the sign-in box, ready for a different account. Your saved .tog projects stay on the computer — logging out only removes the sign-in. Use it on a shared or borrowed PC, or before handing a laptop to someone else.

Locked out after several wrong passwords? After 10 unsuccessful attempts the account pauses sign-in for 15 minutes — this stops anyone guessing their way in. You don't have to wait: use Forgot password? and you can sign in again as soon as the reset is done.

Working offline

Your drawings never leave your computer. The only thing Takeoff Studio sends over the internet is your sign-in and the licence check. PDFs, markup, quantities and .tog project files stay local.

2 · The workspace

The window has three parts:

Workspace
Toolbar (top), drawing canvas (left), sidebar & ledger (right).

3 · Setting the scale

Every sheet keeps its own scale. Set it before (or right after) measuring so quantities compute correctly:

Recompute on change: if you change a sheet's scale after measuring, every takeoff on that sheet re-quantifies automatically.
Takeoff Studio will stop you measuring an unscaled sheet. If you start a Linear or Area takeoff on a sheet that has no scale yet, you are asked whether to set the scale first — because without one there is nothing to convert pixels into feet, and the takeoff would be logged with a blank quantity. Count takeoffs never ask: 28 doors is 28 doors whether or not the sheet is scaled.

5 · Starting a takeoff

Click ➕ Start New Takeoff in the sidebar. The Name & Categorize Takeoff dialog appears — you enter everything up front:

Then pick a mode and click on the drawing. Click ⏹ Stop Takeoff when the item is finished — it logs to the ledger automatically.

Name & Categorize dialog
Name, CSI, color, count symbol and categories — all set up front.

5b · Assemblies — your own library

Most estimators measure the same things over and over. Rather than retyping a name, CSI code, color, fill and material conversion on every project, save the setup once as an assembly and apply it in one click.

An assembly can be a single material or a dozen. A one-material entry is simply an assembly of one — it behaves exactly like the presets did.

At the top of the Name & Categorize Takeoff dialog:

Assembly picker
Pick an assembly and the whole dialog fills in — description, CSI code, color, fill pattern and every component’s material conversion.
The library ships EMPTY, on purpose. Earlier versions seeded 24 ready-made Division 09 presets. They are gone. A library written by us encodes our assumptions about your trade — and a drywall sub, a concrete sub and a general contractor break the same wall down differently. A coverage factor that does not match how you buy is worse than no factor at all, because it invites you to trust it. What is in your library is what you put there.
Three examples, if you want them. Load examples adds Slab on grade, Interior partition and Concrete wall. Each one breaks a single measurement into materials bought in different units — a slab taken off in SF buys concrete by the CY, vapour barrier by the SF and reinforcing by the LB — which is the idea worth seeing once. They are examples, not rules: edit them, rename them, delete them. Pressing the button again never overwrites anything you have changed.
Sharing your library with your team. Your assemblies live in a single file in your user folder: C:\Users\<you>\.takeoff_studio_presets.json. Copy or email that file to another machine and that estimator has your whole library — no cloud service, no sync to set up, no subscription.
About the codes. CSI codes you type are standard construction section numbers, used as a convenience. Takeoff Studio is not affiliated with, endorsed by, or certified by any standards organization. Every code and description is fully editable — use your own office coding, and verify codes against whatever standard your project requires.

5c · Assemblies — one measurement, several materials

A partition run is never one material. Measure 1,000 LF of wall and you owe the bid board, studs, tape and finish, primer and paint — five lines, five CSI codes, five different coverage factors, all off the same measured length. Measuring that wall five times is five chances to measure it differently.

An assembly measures it once. You draw the wall, press Stop Takeoff, and the ledger gains one row per material — each with its own description, its own CSI code and its own ORDER QTY worked off that one length.

Building one

  1. Press ➕ Start New Takeoff.
  2. In the ASSEMBLY row, click 🧱 Components….
  3. + Add one component per material. Each asks for three things:
    • Description — this becomes the estimate line.
    • CSI Code — leave it blank to use the takeoff's own code.
    • Measures — set inside ⚙ Set up conversion…, because it decides which number everything else in that window is applied to. See Area and perimeter just below.
    • Coverage basis — see the warning below. This is the important one.
    then ⚙ Set up conversion… for that material's material unit, dimensions, factor and waste (the same window described in §15). Each component is priced in ITS OWN unit, so one slab can buy concrete by the CY, barrier by the SF and steel by the LB.
Assembly components
The Priced as column shows what each material becomes: 12.34 CY, 1,130 LBS, 1.47 rolls (order 2).
  1. ▲ / ▼ put them in the order you want them on the estimate; ✕ Remove drops one.
  2. Save Assembly, then Save as preset… on the main dialog so you never build it again. Assembly presets sit in the picker beside the plain ones.
  3. Measure the wall and press ⏹ Stop Takeoff.
Assembly components
One partition assembly: four materials, four coverage factors, one measurement.

Area and perimeter from one outline

Some work is bought two ways off the same shape. Draw a basement once and the area gives the cubic yards to excavate and haul, while the perimeter of that very same outline gives the footing forms, the drain tile and the waterproofing. A slab gives the concrete from its area and the edge form from its perimeter; a room gives the carpet from its area and the base from its perimeter.

Open ⚙ Set up conversion… and set the Measures box to The PERIMETER of the area. That material then measures the outline: an ordinary length line — LF (or LM in metric) — with its own coverage, its own ORDER QTY and its own price. It shows from PERIMETER in the component list so you can tell the two apart at a glance, and the worked example at the bottom of the conversion window starts from the perimeter so you can see what you are about to price.

This is not only for assemblies. Measures lives on the material conversion, which an ordinary takeoff reaches the same way — press ➕ Start New Takeoff, then ⚙ Set up conversion…. So you can draw a room as an area and bill the rubber base off its perimeter without building an assembly at all. Use an assembly when you want the area and the perimeter off one shape; use a plain takeoff when the perimeter is all you are after.
Coverage basis — get this right and the order quantities are right. Coverage means two different things depending on the material: Pick the right basis on each component and Takeoff Studio switches the height and faces boxes off where they do not belong, so the mistake cannot be made.
Assembly in the ledger
One wall measured once — three estimate lines, one piece of markup on the drawing.

Living with an assembly

Nothing changes unless you use it. Every takeoff without components behaves exactly as it always has: one takeoff, one estimate line. The ASSEMBLY row on the dialog reads "Not an assembly" until you put something in it.

Your own assembly library

An assembly you built by hand is worth keeping. Once it is right, save it and it is waiting in every project you ever open.

  1. Build the assembly and press Save Assembly.
  2. On the Name & Categorize dialog, press Save as preset….
  3. Give it a name — e.g. Partition type A — 3-5/8" @ 16" o.c.
  4. Give it a group — e.g. My Assemblies, or Division 26, or anything you like. The group is just a heading in the drop-down; invent as many as you find useful.

The whole assembly is saved — every material, with its own CSI code, order unit, coverage, waste, height, faces and coats. Pick it from the PRESET drop-down in any project and all of the materials come back with it. Saving under a name you have already used updates that one instead of adding a duplicate.

The drop-down tells you which presets are assemblies. An assembly shows the number of materials it will produce, so you know what you are about to get before you pick it:
Drywall  ·  5/8" Type X GWB — walls
My Assemblies  ·  Partition type A   (3 materials)
A plain preset shows no count — it is one takeoff, one estimate line.
Any trade, not just Division 09. Nothing about assemblies is finishes-specific. The CSI code on each component is yours to type, so a Division 26 assembly (conduit + wire + boxes + devices off one measured run), a Division 31 assembly, or anything else works exactly the same way. Nothing about assemblies is tied to a trade — the library starts empty and fills with whatever you build.

The Assemblies tab in the workbook

Breaking a wall into materials is only half the point; the other half is seeing what that wall costs. Every job containing an assembly gets an Assemblies tab — one tab, not one per assembly — with each assembly as its own block:

4in slab on grade   -   measured 1,000 SF   on S-101

 CSI       MATERIAL               QTY PRICED  UNIT    ORDER QTY  UNIT COST  EXTENDED
 03 31 00  Concrete 4000 psi           12.34  CY          12.34   $185.00  $2,283.72
 07 26 00  Vapour barrier 10 mil    1,000.00  SF       1,000.00     $0.28  $  280.00
 03 21 00  Reinforcing steel        1,130.00  LBS      1,130.00     $0.92  $1,039.60
 03 22 00  Welded wire mesh             1.47  rolls           2   $210.00  $  308.00
                       4IN SLAB ON GRADE  SUBTOTAL                         $3,911.32
                       cost per SF of slab measured (1,000 SF)                 $3.91
The Assemblies tab
One measurement, four materials, four units — and every row reads straight across: 12.34 CY × $185.00 = $2,283.72.

The Bid Summary also gains a BY ASSEMBLY block. Unlike category tags, assemblies do not overlap — a line belongs to one or to none — but they still cover only the scope you measured as an assembly, so they do not sum to the bid.

Your assemblies travel with you. They are saved in a single file: C:\Users\<you>\.takeoff_studio_presets.json. Copy that one file to another machine and your whole library — one-material entries and assemblies together — goes with it.

6 · Count takeoffs & symbols

In Count (EA) mode each click drops a marker and increments the count. Pick a count symbol in the Start-Takeoff dialog so different fixture types stay visually distinct on one sheet:

SymbolGood for
✳ asterisk (default)general counts
✓ check   ✕ Xaccept / reject, present / removed
▢ square   + plusoutlets, junction boxes
● circle   ○ hollow circlelights, fixtures
▲ triangle   ◆ diamond   ★ starsprinklers, alarms, special items
Count symbols
Different count symbols distinguish device types at a glance.

7 · Linear takeoffs, line weight & arcs

In Linear (LF) mode, click point to point and the segments chain together into a continuous run — 1 → 2 → 3 → 4… To start a disconnected run, double-click to "lift the pen," then click again; every run still adds into the same takeoff. For a curved wall, press R (or ⌒ Arc (R)) and click begin · middle · end — Takeoff Studio computes the true arc length and folds it into the run. A curve draws as a single arc outline with one length label, so it never hides the drawing underneath.

Arc takeoff
An arc reads as a curve, with a single length label at its crown.
Auto-straighten (no buttons). As you move from the last point, a near-horizontal or near-vertical move locks onto that axis automatically and a rubber-band line previews the segment, so straight walls need no effort. Want a diagonal? Hold Shift to move freehand at any angle; release to resume auto-straighten. The large surveyor target cursor (open diamond with a red center dot) marks the exact point without hiding the linework underneath.
Line weight & style. Set the line thickness (1–6 px) and a solid / dashed / dotted style in the Start-Takeoff dialog (or later in ✏ Edit) — a real differentiator for telling runs apart (new vs. existing, demo vs. proposed). Takeoff lines are drawn ~50% see-through so a line laid over dimensions or notes never hides the drawing information you still need to read — on screen and in the print/export.
Line weight and style
Different line weights and styles keep runs (new vs. existing, demo vs. proposed) distinct.

8 · Area takeoffs, perimeter & cut-outs

In Area (SF) mode, click the corners of a room; the region fills in live and the square footage updates on every click. Double-click to close a room, then keep clicking to add more rooms — ⏹ Stop Takeoff sums them all into one ledger item. Press R mid-boundary for a curved edge.

Perimeter is shown too. Each area label on the drawing shows the square footage with the perimeter right below it in the same box, and the sidebar shows a running Perimeter total — handy for base, edge trim and wall quantities.
Fill patterns. Give an area a hatch — horizontal, vertical, diagonal ╱ or ╲, crosshatch, or brick — from the Start-Takeoff dialog (or change it later in Edit). Two neighboring areas then read as clearly different scopes even when their colors are close, on screen and in the printed/exported markup. The default is None (a light color wash, no hatch — the area still shows its color), and the pattern resets to None on every new takeoff so a hatch never carries over by accident. Area quantity labels are slightly translucent so the linework under them stays visible, they auto-place in the upper-left of the area, and you can drag any label to reposition it (it stays where you put it, on screen and in the export/print).
Auto-straighten works here too. Area edges snap to horizontal/vertical the same way (hold Shift for a free diagonal).
Area with perimeter
Area label shows square footage and perimeter together.

Cut-outs — subtracting islands, voids & openings

Real areas have holes in them: landscaped islands in a parking lot, a stair or elevator opening in a floor slab, an equipment pad you aren't paying for. Click ➖ Subtract Area (cut-out) to switch into deduct mode, click the corners of the hole and double-click to close it — its square footage is deducted from the takeoff and the label shows the net area.

There are two ways in, and both work:

The button turns gold and reads ➖ Subtracting (cut-out) — ON while the mode is active, and the mode resets after you Stop the takeoff.

It's a real punched hole. A cut-out isn't drawn on top of the fill — the fill and its hatch are actually removed, so the bare drawing shows through the hole (the island, the shaft, the pad) exactly as it would on a marked-up print. The region's label shows the NET square footage. Punched holes carry through to the PDF/PNG export and the printout, not just the screen.
Cut-outs apply to Area takeoffs. If you press ➖ Subtract with nothing selected — or with a Count or Linear takeoff selected — the status bar tells you to select an area takeoff first; nothing is changed.
Area with a punched cut-out
A cut-out punches a true hole through the fill — the drawing shows through, and the label reads the net area.

9 · The takeoff ledger (find & sort)

Every finished takeoff appears in the TAKEOFFS ledger (description · quantity · unit), colored to match its markup, with running totals per unit. Click a row to highlight that takeoff on the drawing.

The ledger is where you change the words; the drawing is where you change the shape. Double-click a row (or select it and click ✏ Edit) to open its Name & Categorize screen — description, CSI code, tags, color, price. Clicking the markup out on the drawing instead picks the takeoff up for reshaping.

Finding one takeoff among hundreds

Ledger filter
Type to narrow hundreds of takeoffs to the one you want; the total follows the filter.
Takeoffs with no quantity sort to the bottom, in both directions. An unmeasured takeoff is "not measured yet", not zero.

9b · Comparing drawings — overlays

Pricing a revision? Overlay the two revisions, measure what changed, and tag each takeoff Added / Revised / Removed — Takeoff Studio then builds a priced Revision Summary in the Excel workbook.

Takeoff Studio can lay multiple sheets over one another so you can compare Architectural, Structural and MEP at a glance — coordinate clashes, sleeve locations, slab edges vs. walls, and more. First load the sheets with ➕ Add Drawing, then open 🗂 Overlays.

Alignment: sheets from the same set (same sheet size) register automatically by the drawing coordinate system. If a sheet is a different size or shifted, use the per-overlay nudge/scale to bring it into register.
Drawing overlays
Architectural, structural and MEP laid over one another — each overlay in its own color, with nudge/scale alignment.

9c · Zones — tag an area to a donor / category, and bill only the part it covers

A zone tags every takeoff a region of the drawing covers, at once — perfect when a donor funds one wing, a phase covers part of a floor, or a grant pays for a specific area. Zones belong to the sheet you draw them on (they don't appear on other sheets). Open 🏷 Zones to manage them; click ➕ New zone, then:

A zone bills only the part it covers

Work doesn't stop politely at the edge of a donor area. A sidewalk runs the length of the site; a wall base runs the width of the floor. A zone measures how much of each takeoff is actually inside it, and its Excel tab bills that amount — not the whole takeoff, and not nothing.

On the zone's Excel tab a partly-covered takeoff shows its covered quantity in gold, with a line above the table saying so — so a number that doesn't match the same takeoff's row on By CSI is never a mystery. Its unit costs still come from By CSI, so you price the item once and every zone it touches follows.

Why this matters. Zones used to tag a takeoff only if its center fell inside, which is all-or-nothing: a sidewalk crossing the corner of a bench area has its center nowhere near that corner, so the zone reported none of the concrete it plainly ran across. Now it reports the part it covers.
A zone cutting across several takeoffs
The zone cuts across three takeoffs rather than around them — 504 SF of the 1,008 SF floor, 29 LF of the 60 LF wall base, and 4 of the 9 receptacles. Its Excel tab bills exactly those.

Zones are fully editable from the Zones panel — each one has:

Because a tag's value is the sum of its line items, Donor A has its own Excel tab that totals everything in that area — no manual selecting — and it stays in sync as you edit the zone. Zones are saved in the project file.

Tip: a takeoff can belong to several zones/tags at once (e.g. Phase 1 and Donor A), so donor rollups and phase rollups coexist. Your own hand-typed tags are never removed by zone edits.
Zones
Draw a region, name it (e.g. Donor A) — every takeoff it covers is tagged, and gets its own Excel tab.

10 · Adding to a takeoff — and deleting part of one

Missed a room? You don't have to start over. Select the takeoff in the ledger and click ➕ Add More to Selected Takeoff. Its geometry reloads as the active measurement on its own sheet — keep clicking the extra rooms/walls/counts, then ⏹ Stop Takeoff re-logs it with the additions merged in.

Not available on an assembly. Adding to one material of an assembly alone would leave its quantity out of step with the others measured off the same wall, so Takeoff Studio says so instead of doing it. Measure the extra run as a new takeoff with the same assembly preset.

Add more to a takeoff
Select a takeoff → Add More → keep measuring → Stop to merge.

Took off the wrong room? Delete just that piece

Five rooms of tile in one takeoff, and the fourth one turns out to be the wrong room. Select the takeoff and click ✂ Parts: every piece of it is listed separately — each room of an area takeoff, each run of a linear one, each mark of a count — with its own quantity.

Delete part of a takeoff
Pick the piece, see it highlighted on the sheet, delete just that one.

10b · Reshaping a takeoff you've already drawn

Drew the wall two feet short? Took the room to the wrong side of a partition? You no longer have to delete the takeoff and start again — which threw away its name, CSI code, prices, tags and its place in an assembly along with the shape.

Click the takeoff's markup on the drawing. Its corners turn into white square handles, the status bar says how many, and nothing else changes.

Where two legs of a linear run meet, the corner is one handle — drag it and both legs follow, so a run can never be torn in half.

Two things deliberately have no handles. A curve is stored as dozens of tiny straight segments, so dragging one of them would turn a smooth arc into a saw blade — redraw a curve instead of reshaping it. (Neither can the point where a straight leg meets a curve, which would walk the leg off the end of the arc.) A count takeoff has no shape to pull on; use ✂ Parts to remove a mark.
Reshaping a logged takeoff
Click the markup → white corner handles. One corner dragged out here and the carpet takeoff re-measured itself from 320 SF to 442 SF, keeping its name, color and CSI code.

11 · Editing colors, line style, patterns & symbols

Select a takeoff and click ✏ Edit (or double-click it, or click its markup on the drawing) to change its description, CSI, categories, color, count symbol, area fill pattern or line weight & style — changing the color recolors its markup. 🗑 Delete removes a takeoff and its markup.

11b · Drawing notes, labels & arrows

Click 🗒 Note to drop a text label on the sheet — handy to name a drawing with no title block, flag an assumption, or call out an area. A note box appears at the center of the view; type your text and drag it anywhere. Double-click a note to edit it again.

Notes print and export with the sheet, so they're part of your defensible marked-up record. The border box is drawn at line weight 2 — the same thin line as a Linear takeoff at weight 2.

Arrows — point a note at what it means

In the note window, click ➚ Draw arrow. The arrow starts on the edge of the note's box and takes the note's color. Click to add a bend — as many as it takes to route around the drawing — then double-click on the item to place the arrowhead. The start of the line has no mark; the end has the arrowhead. The line is line weight 2.

A note with a bent arrow
A note's arrow bends around the drawing to the receptacle it means; a free-standing arrow points at a door; the ruler reads to the ½" with no box.

11c · On-drawing legend (for prints)

Click ▤ Legend to drop a legend onto the current sheet that automatically lists every takeoff on that sheet — a color swatch, the description, and the quantity/unit for each. It's built for the moment you need to hand a bidder a printed drawing showing the takeoff trail instead of the Excel.

On-drawing legend
The legend lists every takeoff on the sheet (swatch · description · quantity) and prints with it.

11d · Adding & removing drawings

Use 🗂 Drawings ▾ to manage the PDFs in the project without restarting:

11e · Rotating & naming sheets (📄 Page ▾)

Plenty of drawing sets are plotted sideways — the page is portrait but the drawing on it is landscape, so the title block runs up the left edge and every room tag reads bottom-to-top. That is how the file was made, and nothing can fix it except turning the sheet. 📄 Page ▾ does that, and handles sheet names while you are there.

The Page button on the toolbar
The 📄 Page ▾ button sits just right of the sheet picker and the ◀ ▶ page arrows.

Your writing turns too. Notes, zone titles, dimension figures, quantity labels and the legend all turn with the sheet, so they keep reading the same way round as the drawing's own text — on screen, in an export and on paper. Anything you add AFTER turning a sheet reads straight, which is what you want: straighten a sideways set first, then take it off, and every note you type is the right way up. Turn the sheet again later and that note turns with it.

An upright sheet with a note, zone title and legend
Upright: the note, the zone title Phase 1 — east wing, the legend and every quantity label read across, the same way as the drawing.
The same sheet turned, with the writing turned too
The same sheet after ↻ Rotate Right 90° — the writing has turned with the drawing, so it still reads the same way round as the sheet's own title block. Quantities unchanged: 1,616 SF / 60 LF / 9 EA.

Rotating never changes a quantity. Turning a sheet does not change any distance on it, so your scale and every takeoff you have logged are untouched. You can calibrate first and rotate later, or the other way round. The rotation is saved with the project, so sheets come back the way you left them.

A sheet plotted sideways
A sideways-plotted sheet: the drawing reads bottom-to-top and most of the window is empty.
The same sheet after Rotate Right
The same sheet after one ↻ Rotate Right 90° — same takeoffs, same quantities (1,616 SF / 60 LF / 9 EA), now readable.

Naming a whole set in one pass

Scanned and photocopied bid sets often have no readable drawing number — the sheet picker then shows (no sheet #) for all of them, which is no help when you are picking a sheet or reading an export. ✎ Rename All Sheets… walks the set with you:

The Rename All Sheets walk-through
Rename All Sheets: the box sits clear of the title block, and the next sheet comes up behind it as you press Enter.

Stop whenever you like. Press Esc or close the box. Every name you have typed is already saved — names are applied as you leave each sheet, never held back to the end.

12 · Dimension ruler, auto-straighten & undo

Dimension ruler
Dimension rulers lock H/V and draw with a perpendicular witness tick + 45° slash and a feet-inch label.

12b · Keyboard shortcuts

The mouse does everything, but these keep your hand off it on a long takeoff. Letter keys are ignored while you are typing in a box, so they can never change your mode mid-name.

KeyDoes
Ctrl+SSave the project
Ctrl+ZUndo
Ctrl+PPrint the current view
Ctrl+NStart a new takeoff
L / A / C Switch to Linear / Area / Count
RDraw an arc inside a Linear or Area takeoff
EnterStop (finish) the current takeoff
EscCancel the current arc, zone or measurement — or finish reshaping a takeoff
+ / −Zoom in / out
0Zoom to fit the sheet
Note. The arc key is R (think radius). A now switches to Area mode.

13 · Saving & backups

💾 Save writes a .tog project file that stores your drawings reference, every takeoff, and all colored markup — including zones, notes, dimension rulers, legends, sheet rotations and drawing overlays. 📂 Open (or a Recent project on the Home screen) restores it exactly, so the marked-up drawing is your defensible record.

Your work is written when you say so

Nothing is written to your project in the background. Takeoff Studio saves when you press 💾 Save, and at no other time. The bottom-right corner of the window shows when your work last reached disk.

A takeoff is hours of work, so the two moments where it could be lost are both guarded:

Save indicator
The status bar always tells you when your work was last written.
Press 💾 Save when you finish a takeoff. Ctrl+S does the same thing. It is the one habit worth building: nothing else writes your project for you.

13b · Pricing in the app

You price in the unit the material is sold in. If a takeoff carries a material conversion, the Pricing window shows the converted quantity and its unit — 12.34 CY, 1,130 LBS — and the rate you type is a rate in that unit: $/CY, $/LBS. A takeoff with no conversion is priced in the unit you measured, exactly as before.

A takeoff runs over days, and so does pricing. If your prices live only in an exported spreadsheet, then re-exporting after you measure one more room hands you a fresh blank template and strands everything you typed. So prices live in the project: type them once, and every export from then on comes out priced.

Pricing grid
The Pricing window: unit costs on the lines the workbook will carry.

14 · Export, print & Excel

There are two workbooks, and they are for two different readers. 📊 Create Excel Report is the estimator's working document — every quantity, the conversion block, and the material / labor / equipment split. 📄 Executive Summary is the one you send to the client. See §14b.

Excel report
The By CSI master tab: enter unit costs once, division subtotals and category tabs follow.
Bid Summary tab
Bid Summary: the one-page recap. Every figure is a live link to the detail tabs, so it cannot disagree with them.
Print preview
Print Preview shows exactly what will print — markup, labels, notes, dimensions, legend, overlays and zones.

14b · 📄 Executive Summary — the client deliverable

The workbook in §14 is your document. It shows the material, labor and equipment behind every rate, because that is how you build and defend a number. An owner or a GC executive does not want that breakout — they want the project summed by CSI division, one unit cost a line, and a bottom line they can read in a minute.

📄 Executive Summary sits under 📊 Create Excel Report and writes a separate file. It is deliberately not produced every time you export — you make it when you are ready to issue, so a half-priced estimate never leaves the office looking finished.

What it asks for

These settings live in the project, not in the spreadsheet. Set the gross area and your markups once; reissue next week and they come back as you left them. Same reasoning as pricing (§13b) — anything you can change has to survive being regenerated, or you end up with _v2 and _final filenames.

Sheet 1 — Project Cost Summary

Every CSI division on one page, in three column pairs: Building Cost, Site Work and Total Cost, each showing dollars and $/GSF. Then DIRECT CONSTRUCTION COST, the markup rows, and TOTAL CONSTRUCTION COST.

Sheet 2 — Estimate Detail

CSI · Line · Description · Quantity · UM · Unit Cost · Total. Lines are numbered 005, 010, 015 within each division, so you can insert one later without renumbering everything beneath it. Each division gets a subtotal. Takeoffs tagged Added or Removed are listed after the estimate, each group with its own subtotal, and are not in the construction cost.

It is built from your takeoffs. Lines you have not measured — lump-sum allowances, a miscellaneous steel number — are not on it, because the app has no way to know about them. Add them in the spreadsheet after you generate it, and keep in mind that regenerating writes a fresh file.

15 · Material conversion & waste

You measure what the drawing gives you. You price what the material is sold in. A slab is taken off in SF; the concrete in it is bought by the CY, the vapour barrier by the SF and the reinforcing by the LB. Material conversion is how one measurement becomes all three.

In the Name & Categorize Takeoff dialog, find MATERIAL CONVERSION and click ⚙ Set up conversion… On an assembly each component has its own, so the materials of one wall can be priced in four different units.

One model: dimensions, a factor, waste

Everything in construction is measured in some combination of length, width, height and each — then a factor turns that into the unit the material is bought in. The window has one row for each idea:

The boxes your takeoff already filled in are greyed out and marked — from the takeoff. An area takeoff has already measured length and width, so only thickness is left to give; a linear takeoff has measured length; a count has counted the eaches. What is still editable is what is still needed.

Two exceptions worth knowing. A box that already has a number in it is never greyed — your figure stays, because greying clears a box and clearing it would change what that line measures. And if the material is set to measure the perimeter (see §5c), the takeoff has supplied a length only, so Width comes back: 360 LF of footing form × 2 ft high is 720 SF of form face.

What you’ll price

The line at the bottom spells out the arithmetic on your measured quantity, not a worked example, so you can check it against the drawing in front of you:

Example — you take off 1,000 SF of slab:
    Concrete        Material unit = CY     Height = 0.33   Factor = ÷ 27     →  12.22 CY
    Vapour barrier  Material unit = SF     (nothing else)                  →  1,000 SF
    Rebar           Material unit = LBS    Factor = × 1.13                →  1,130 LBS

What you’ll price:   1,000  × 0.3333 ft  ÷ 27  =  12.34 CY
                     You will price this line in $/CY.

Leave it all blank and the line is simply priced in the unit you measured in — which is right for a great many takeoffs. Clear empties every field at once; Cancel leaves the takeoff exactly as it was.

Priced quantity and order quantity are two different numbers. You price 198.52 CY of concrete and you order 199. Rounding is right for sheets, rolls and cartons — you cannot buy 458.3 sheets — and wrong for CY, LBS, SY and TONS, where it would quietly inflate every concrete, rebar and gravel line in the bid and stop your number tying to the supplier’s quote. That is what Sold in whole units decides. The priced quantity is never rounded.
Material Conversion window
A slab measured in SF, converted to CY of concrete. Length and Width are greyed — the area takeoff already measured them — so thickness and the factor are all that is left to give.

In the workbook

The conversion becomes a block of columns beside the quantity on the By CSI tab — LENGTH, WIDTH, HEIGHT, EACH, FACTOR, × / ÷, WASTE % — followed by the three that matter on bid day:

One rule: a unit cost is per the unit named in the Material Conversion window. If that window says “You will price this line in $/TONS”, then your rate is $/TON and the workbook extends it off tons — on every sheet, on every line, with no exceptions. The window tells you the quantity and the unit before you type a price, so what you see there is what you get.

If you are reopening a job priced in an older build, check its converted lines once. Earlier releases could price some lines per the unit they were measured in, so a slab taking $6.50 per SF of footprint now reads $6.50 per CY of concrete. Only lines that have a material conversion and a rate already typed are affected — open 💲 Pricing, read the Qty and Unit columns, and retype any rate that was meant per measured unit.

16 · Drawing revisions & the revision report

Overlays (§9b) let you put two revisions of a sheet on top of each other and see what moved. Revision tagging turns that picture into a priced answer to the question a GC actually asks: what did this revision cost us?

While comparing overlays, measure the scope that changed and set REVISION at the top of the Name & Categorize dialog:

Revision status buttons
Tag the scope a drawing revision added, changed or deleted.

When anything is tagged, the Excel workbook gains a Revision Summary tab listing each change grouped by status, with a subtotal per group and a NET REVISION IMPACT at the bottom. Removed scope is carried as a credit, so the net figure is the true cost of the change rather than a sum of unrelated numbers. Quantities and costs on that tab are linked to the By CSI master, so pricing entered once flows through and the report can never disagree with your estimate.

Revision Summary tab
The priced answer to “what did this revision cost us?” — removed scope carried as a credit.

Added and Removed are kept out of the bid. On By CSI and every category tab they are priced in their own blocks below the SHEET TOTAL — ADDED SCOPE – pending owner / client approval and REMOVED SCOPE – credit if approved — each with its own total. The Bid Summary lists both under TOTAL BID, and the Executive Summary lists them under TOTAL CONSTRUCTION COST, so the owner can approve or reject each one.

Added and Removed scope below the sheet total
The SHEET TOTAL ($7,265.60) is base + revised only. Added and Removed scope are priced below it, each with its own total, for the owner / client to approve.
No revisions, no tab. A project where nothing is tagged produces the same workbook as before — the Revision Summary only appears when you have actually used it.

17 · Imperial / metric units

Units are chosen on the Home screen and can be toggled in the toolbar. Imperial measures in feet/inches, SF and EA; metric measures in metres, m² and EA. Geometry is unaffected — only the scale factor and unit labels change.